Mumbai Metro with 10 lines is an urban Mass Rapid Transit System (MRTS) being built to serve Mumbai, Maharashtra’s capital and largest city.
Its development has been entrusted to the Mumbai Metropolitan Region Development Authority (MMRDA), who in 2004 came out with a 146.5 km master plan with multiple lines. Due to various issues which range from policy paralysis (EPC vs PPP, metro rail vs monorail) to environmental issues, the MMRDA has so far only been able to develop 1 metro line in the suburbs connecting Versova – Andheri East – Ghatkopar.
In 2015, a new 118 km master plan was approved and the then incumbent government provided much needed impetus for the development of 2 lines: Dahisar East – Andheri East (Red Line) & Dahisar East – D.N. Nagar (Yellow Line) in addition to the Cuffe Parade – BKC – Aarey Colony (Aqua Line).
In June 2019, a new nodal agency called Maha Mumbai Metro Operations Corporation (MMMOCL) was established for operating and maintaining all Mumbai Metro services on lines owned by MMRDA. In September 2019, the MMRDA unveiled a new 337 km master plan for Maha Mumbai Metro’s network consisting of 10 lines (total of 17 sections).
The Delhi Metro Rail Corporation has lent its services as the interim General Consultant for the execution of most lines.
Key Figures
Operational: 59.19 km | Under Construction: 143.65 km | Approved: 0 km | Proposed: 115.8 km
Line | Terminals / Corridor | Length (Km) | Stations | Status |
Line-1 | Verova – Andheri – Ghatkopar | 11.4 | 12 | Operational |
Line-2A | Dahisar (E) – DN Nagar | 18.60 | 17 | Operational |
Line-2B | DN Nagar – Mandale | 23.64 | 22 | Under Construction |
Line-3 | Cuffe Parade – BKC – Seepz – Aarey Colony | 33.50 | 27 | Patially Operational |
Line-4 | Wadala – Kasarawadavali | 32.32 | 32 | Under Construction |
Line-4A | Kasarawadavali – Gaimukh (extn of Line-4) |
2.88 | 2 | Under Construction |
Line-5 | Thane – Bhiwandi – Kalyan | 24.95 | 17 | 12.811 km Under Construction; Rest On-Hold |
Line-6 | Swami Samarth Nagar – Vikhroli | 15.18 | 13 | Under Construction |
Line-7 | Dahisar (E) – Andheri (E) | 16.5 | 14 | Operational |
Line-7A | Andheri (E) – CSI Airport (extn of Line-7) |
3.17 | 2 | Under Construction |
Line-8 | CSIA – NMIA (Airport Connector) |
35 | 7 | Proposed |
Line-9 | Dahisar (E) – Mira Bhayander (extn of Line-7) |
11.38 | 8 | Under Construction |
Line-10 | Gaimukh – Shivaji Chowk in Mira Road (extn of Line-4) |
9.20 | 4 | Approved |
Line-11 | Wadala – Chhattrapati Shivaji Maharaj Terminus (extn of Line-4) |
12.77 | 10 | Proposed |
Line-12 | Kalyan – Taloja (extn of Line-5) |
22.17 | 19 | Under Construction |
Line-13 | Shivaji Chowk (Mira Road) – Virar | 23 | 20 | Proposed |
Line-14 | Kanjurmarg – Badlapur | 45 | 40 | Proposed |
On February 28, 2020 – the MMRDA unveiled official line colors as part of a major branding exercise to establish style guidelines with help from Systra MVA Consulting.
Mumbai Metro – Operational Lines
Line-1 – Blue Line: Versova – Andheri – Ghatkopar (11.4 km, 12 stations)
• Operator: Mumbai Metro One Private Ltd. [JV of Reliance Infra (69%), MMRDA (26%) & Veolia Transport (5%)]
• Stations: Versova, D.N. Nagar, Azad Nagar, Andheri, Western Express Highway (WEH), Chakala, Airport Road, Marol Naka, Saki Naka, Asalpha, Jagruti Nagar, Ghatkopar
• Depot: Four Bungalows (DN Nagar)
Line-2A – Yellow Line: Dahisar (East) – Andheri West (18.6 km, 17 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Depot: Malvani in Charkop (shared with Red Line)
• In-depth line information can be viewed here
Line-3 – Aqua Line: BKC – Aarey JVLR (12.69 km, 10 stations)
• Owner: Mumbai Metro Rail Corporation Ltd [50-50 JV of GOI & GoMH]
• Operator: Delhi Metro Rail Corporation (DMRC) for 10 years
• Depot: Aarey Colony
• In-depth line information can be viewed here
Line-7 – Red Line: Dahisar (East) – Gundavali (16.5 km, 14 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Depot: Malvani in Charkop (shared with Yellow Line) & Dahisar East
• Note: In the future, this line will be extended to Mira-Bhayander in the north (Line-9 with 8 stations) and to CSI Airport’s Terminal-2 (Line-7A with 2 stations)
• In-depth line information can be viewed here
Mumbai Metro – Under Construction Lines
Line-2B – Yellow Line: D.N. Nagar – Bandra – Mandale (23.643 km, 22 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Depot: Mandale
• In-depth line information can be viewed here
Line-3 – Aqua Line: Cuffe Parade – BKC (20.81 km, 17 stations)
• Owner: Mumbai Metro Rail Corporation Ltd [50-50 JV of GOI & GoMH]
• Operator: Delhi Metro Rail Corporation (DMRC) for 10 years
• Depot: Aarey Colony
• In-depth line information can be viewed here
Line-4 – Green Line: Bhakti Park (Wadala) – Ghatkopar – Thane – Kasarvadavali (32.32 km, 32 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Depot: Vikhroli & Mogharpada
• Note: On the north side, the line is currently being extended by 2.88 km to Gaimukh (Line-4A with 2 stations) and is approved to be extended by 9.2 km onward to Mira Road (Line-10 with 4 stations). On the south-side, the line in the future will be extended to the CST Station (Line-11 with 10 stations) in South Bombay, and possibly onward to Apollo Bunder in the future.
• In-depth line information can be viewed here
Line-5 – Orange Line: Thane – Bhiwandi – Kalyan (23.50 km, 17 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Depot: Kasheli
• Note: 12.811 km Thane – Bhiwandi is under construction. Bhiwandi – Kalyan is on-hold (route modification in progress). In the future, this line will be extended from Kalyan to Taloja as part of Line-12
• In-depth line information can be viewed here
Line-6 – Pink Line: Lokhandwala – JVLR – SEEPZ – Kanjurmarg (14.47 km, 13 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Depot: Kanjur Village (Kanjurmarg) along EEH
• In-depth line information can be viewed here
Line-12 – Orange Line: Kalyan – Taloja (22.17 km, 19 stations)
• Owner: Mumbai Metropolitan Region Development Authority
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Note: This is a southern extension of Line-5
Mumbai Metro – Proposed Lines
Line-8 – Gold Line: Chhatrapati Shivaji Maharaj International Airport (CSIA) – Navi Mumbai International Airport (NMIA) (35 km, 7 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• Note: This will be an express line connecting the region’s existing airport with the new airport.
Line-11 – Green Line: Bhakti Park – CSMT (12.744 km, 10 stations)
• Owner: Mumbai Metro Rail Corporation (MMRC)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
• In-depth line information can be viewed here
Line-13 – Purple Line: Shivaji Chowk (Mira Road) – Virar (23 km, 20 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Operator: Maha Mumbai Metro Operations Corporation (MMMOCL)
Line-14 – Magenta Line: Vikhroli – Kanjurmarg – Badlapur (45 km, 40 stations)
• Owner: Mumbai Metropolitan Region Development Authority (MMRDA)
• Note: This line is proposed to be built on the public-private partnership (PPP) model. Italian firm MM SpA (owned by Municipality of Milan) was appointed as the preparer for its Detailed Project Report (DPR) in October 2019.
Mumbai Monorail – Operational Lines
• Line-1: Chembur – Jacob Circle (19.54 km, 17 stations)
The embedded maps below show the exact location of all stations and can be zoomed into!
Mumbai Metro Route Map (Operational)
Key: Blue Line (Line-1) | Yellow Line (Line-2A) | Aqua Line (Line-3) | Red Line (Line-7) | Monorail Line-1
Mumbai Metro Route Map (Operational & Under Construction)
Key: Line-1 | Line-2 | Line-3 | Line-4, Line-4A | Line-5, Line-12 | Line-6 | Line-7, Line-7A, Line-9 | Monorail
An official PDF route map of Mumbai Metro’s master plan will be added here when available.
Mumbai Metro Future Network (2030) Route Map
Key: Blue Line (Line-1) | Yellow Line (lines 2A, 2B) | Aqua Line (Line-3) | Green Line (lines 4, 4A, 10, 11) | Orange Line (lines 5, 12) | Pink Line (Line-6) | Red Line (lines 7, 7A, 9) | Gold Line (line-8) | Purple Line (Line-13) | Magenta Line (Line-14) | Monorail and Thane Metrolite| Navi Mumbai Line-1
Mumbai Metro Fares (Ticket Prices)
Fares on the Blue Line (Line-1) are calculated based on distance traveled and dependent on type (see in detail on operator’s website)
• Single Journey (one-way) – Minimum fare is Rs. 10 and maximum is Rs. 40
• Return Journey (two way) – Minimum fare is Rs. 20 and maximum is Rs. 75
• 45 Trip Pass (for monthly discount) – valid for 30 days from issue
• Store Value Pass (SVP) – eligible for cashback: 2% for Rs 200 recharge amount, 4% for Rs 300, 6% for Rs 400, 8% for 500 and 10% for Rs 600 and above.
Fares for the rest of the lines has not been set or revealed yet. In February 2020, the MMRDA announced the M-Cube Metro Travel Card for transport across the Mubai Metropolitan Region. Further details are awaited.
Mumbai Metro Tenders
Latest Mumbai Metro tender notices can be viewed on MMRDA’s website and on MMRC’s website. News on these notices, their bidders, awarded tenders and contracts are covered in further detail on the news & construction page.
Mumbai Metro History (Key Dates)
- 8 June 2014: Versova – Andheri – Ghatkopar (Blue Line) – 11.4 km
- 2 April 2022: Dahisar East – Dahanukarwadi (Yellow Line) – 9.50 km
- 2 April 2022: Dahisar East – Aarey (Red Line) – 9.75 km
- 19 January 2023: Dahanukarwadi – Andheri West (Yellow Line) – 9.10 km
- 19 January 2023: Aarey – Gundavali (Red Line) – 6.75 km
- 7 October 2024: Aarey JVLR – BKC (Aqua Line) – 12.69 km
…..more to be added in 2026! Click on ‘News & Construction Updates’ below for project news, progress and updates.
Menu: News & Construction Updates | Overview | Yellow Line | Red Line | Aqua Line | Green Line | Orange Line | Pink Line | Navi Mumbai Metro | Thane Metro
Page last updated: October 23, 2024. Have a question or spot an error? Let me know here.